Remediation & Enabling Works

Sanctus are experts in managing the most complicated environmental engineering challenges and through our in-house remediation and enabling works packages we can support you and your project by removing all ground risks. Furthermore, this can be provided on an all-risk lump sum basis.
With the resources in-house to manage projects from feasibility through to a site being build ready for construction, Sanctus are your ideal partner to not only transform sites but to also deliver excellence. Our team of experts are highly experienced in supporting you with site investigation, technical surveys (including archaeological and ecological) as well as site preparation, demolition, asbestos removal, INNS removal, soil and groundwater remediation, bulk earthworks, ground improvement, temporary works, in-ground construction and works in or near water.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Richborough Converter Station

Site wide remediation, demolition and enabling works at the former power station site. 24,000m³ of heavily reinforced concrete slabs, foundations, and piles recovered and processed for use on-site. 69,000m³ of soil processed and re-engineered on-site. 20,000m² piling and development platform constructed. Treatment and safe release of 19,000,000 litres of water.