Sanctus scrutinises scope and design of proposed works to identify environmental and regulator permitting requirements, limiting delay in commencement, and protecting programme, instead of delaying it.
Permitting requirements are often spotted too late. By the time a bespoke permit application is identified as necessary, works may already be planned, and a new application can take six months or more to clear. Sanctus builds permitting into the remediation and enabling works strategy from the outset, as part of an in-house, contractor-led service, rather than as a separate consultancy exercise handled after the fact.
Why permitting timing matters
On contaminated and brownfield sites, activities such as soil treatment, groundwater treatment, waste transfer and mobile plant operation can all require an environmental permit or a registered exemption from the Environment Agency, or the equivalent regulator in Scotland, Wales and Northern Ireland.
Where a bespoke permit is needed and identified late, the lead-in period becomes a direct risk to programme and cost. Getting the permitting route right early, and aligning it with the remediation and materials strategy, is one of the clearest ways to protect a project timeline, while mitigating or reducing costs associated with offsite disposal.
Our Bespoke Mobile Plant Environmental Permit
Sanctus has held a Bespoke Mobile Plant Environmental Permit since 2006. Where proposed works fall within its scope, this allows treatment plant to mobilise faster than waiting for a new bespoke permit application to clear. It's a genuine commercial advantage for clients on tight programmes: qualifying works can proceed under an established, audited permit that Sanctus has operated for nearly two decades, rather than starting from zero.
How we approach environmental permitting
Early identification
We assess permitting requirements alongside the ground risk and remediation strategy, not after it, so lead-in periods are known from the outset.
Permitting strategy
We determine whether works can proceed under an exemption, under our existing Bespoke Mobile Plant Environmental Permit, or require a new bespoke application.
Application and liaison
We prepare and submit permit applications and exemption registrations, and liaise directly with the Environment Agency and other regulators.
Delivery under permit
We operate treatment and remediation works in full compliance with permit conditions.
Verification and closure
We document permitted activities in a way that supports final regulatory sign-off of the site.
Permitting as part of an integrated capability
Environmental permitting interacts directly with the remediation method chosen, materials reuse and classification under a Materials Management Plan, and the wider enabling works and land remediation programme.
Because Sanctus delivers all of these as one contractor-led service, permitting decisions are made alongside delivery decisions, not negotiated afterwards between separate consultants and contractors.
Explore our most recent work in our dedicated case studies page
Why clients choose Sanctus for environmental permitting
Early identification of permitting risk, including a Bespoke Mobile Plant Environmental Permit held since 2006.
Permitting strategy developed alongside delivery, not as a separate appointment.
Specialist asbestos accreditation, relevant where permitting and asbestos management intersect. See our asbestos in soil service.
A proven track record, with close to 4,000 environmental engineering and improvement projects delivered over almost 20 years. See our awards and accreditations.
Plan your permitting route early
Getting environmental permitting right from the start protects programme, cost and regulatory relationships, and it's easiest to do that with a contractor who identifies the requirement and delivers the works under one roof.
If you have a project where permitting requirements haven't yet been confirmed, get in touch and we'll help you establish the right route before it becomes a critical path risk.
Environmental Permitting Frequently Asked Questions
Does land remediation require an Environmental Permit?
+
It depends on the activities proposed, the treatment methods used, the regulatory status of the materials, and the permitting route that applies. Some works can proceed under an exemption; others need a bespoke permit, which can carry a lead-in period of six months or more if identified late. Permitting requirements should be assessed alongside the remediation strategy, not as a separate, later workstream.
What is a Bespoke Mobile Plant Environmental Permit?
+
It authorises mobile treatment plant to treat contaminated soils and other materials at multiple sites under a single permit, rather than requiring a new permit per site. Sanctus has held this permit since 2006. Where works fall within its scope, it can support faster mobilisation.
How long does an environmental permit application take?
+
Timescales vary by route and by the regulator's current caseload, but a new bespoke application can take six months or more from submission to determination. This is why identifying requirements early in project planning is critical.
Who is responsible for obtaining permits on a remediation project?
+
This depends on the contract, but where Sanctus is appointed as the remediation and enabling works contractor, we typically take responsibility for identifying requirements, determining the right route, and managing the application or exemption registration.
What is the difference between a permit and a registered exemption?
+
An exemption allows certain lower-risk waste activities to proceed with a simple registration rather than a full permit application, provided the activity meets set criteria and limits. A permit is required where an activity doesn't meet exemption criteria, and involves a fuller application and assessment process with the regulator.
What happens if permitting requirements are identified late?
+
If a permit requirement is only spotted once a project is already under way, the lead-in period for a new application can directly delay mobilisation, with knock-on effects for the wider construction programme. Early identification, integrated with the remediation strategy, is the most effective way to avoid this.